Continuing to make progress, albeit slowly -
Both headers are on. All wiring and electrical checks complete. All plumbing on top of the engine is done.
E-Brake is hooked up (pretty cool, note the removable bracket again) - the E-Brake mechanism required some more jockeying of the water tubes.... Heading back out to do the final adjustment and to tie the cables up and out of the way....
Next the speedo cable....
Rocky