Skip to main content

Reply to "dropped floor pans"

Tanks for all the responses. ive decided to remove my floor pans and the frame rails from the firewall forward to include the cross brace but leave the rails from there forward, install complete new frame system at the center tunnel with 2 rails and at the rocker panels and tie them together with new cross brace and also tie into the original frame at each end. seems easiest because the rust issue will be completely eliminated. larry
×
×
×
×