Skip to main content

Reply to "Just to clarify ??...."

Yes that helps, thanks... I have a pretty good understanding of the layout accept for the one detail. My set came w/the #12A part in stainless and it appears #15 in the drawing you kindly posted is rubber. In the set I have #15 is also a hard line, so this creates another connection. The flexible rubber J bend shown would provide flexibility and eliminate two hose clamp connections. J bend w/a spring might be best??... At this point, I'm ready to cut the cooling tube brace off and counter sink it 10" forward and then put an insulated strap across the base of the firewall...
×
×
×
×