I'm plugging away at getting castings and getting out what is machined. Things are crawling along but at least they are moving. I am waiting to hear from MME on the two iron blocks Mark is building. I have 2 aluminum blocks going out for initial aluminum builds and 3 more aluminum blocks in the shop to machine. I am to cast 2 more iron next week. I have managed to pare down my work backlog to mostly just heads for Snyder and C blocks. It looks like it will be a busy fall and winter. I hope to have most, if not all of the deposit blocks out by year's end.

I have been working 6-7 days a week and there is just no end to available work and new projects. If my health wasn't in the crapper this would be easier but I'm playing with the hand I've been dealt and doing the best I can. Thanks for all the support and interest.