Skip to main content

Reply to "Wayne's GT5-S rebuild"

The locks were difficult to build. first I had to cut 2 washers the same thickness as the factory lock, weld the half's on, regrind the assemble into a circle, drill hole and tap for studs, install/weld the studs, grind and polish the face for plating---and the entire part is not more than an inch in diameter.

Attachments

Images (1)
  • Picture_wayne_(33)
×
×
×
×