Skip to main content

Reply to "Winter Projects"

Almost Done!

Good thing we have rain forcasted until the weekend.
Water tanks and hoses installed and Larry cut the main tube from the block to make it level with the swirls tank. We suspect it caused and air pocket previous because it was going "up hill"

Attachments

Images (1)
  • DSCN3166
×
×
×
×