Skip to main content

Reply to "Yaris EPS installation"

In addition, some photos of the final version:

20250319_174206



After shortening and milling two flats to install a double-D U-joint.

20250321_145522_0120250321_17592420250321_18044320250321_180919



20250322_17411620250322_17413520250322_185843

Attachments

Images (8)
  • 20250319_174206
  • 20250321_145522_01
  • 20250321_175924
  • 20250321_180443
  • 20250321_180919
  • 20250322_174116
  • 20250322_174135
  • 20250322_185843
×
×
×
×