Finished the half shafts, spreader bar and A/C fan shroud.
This works was completed last week, before the battery in my camera died.
Attachments
Another from last week.
Attachments
Radiator area cleaned up.
Attachments
Repaired radiator. Thanks to Larry, found a place local that did all the work for less than $225.00
Attachments
Most of this weekend was the detail work around the ZF and engine.
Attachments
A/C shroud.
Attachments
ZF and shift linkage.
Attachments
Spark plug wire loom kit to be installed after my valve covers are done.
Thankfully there is only a few things left to do on the "Have to Do" list. Then I'll be out running and helping Larry on his next project.
Thankfully there is only a few things left to do on the "Have to Do" list. Then I'll be out running and helping Larry on his next project.
Attachments
Got a few more items off the list this weekend. Still waiting for the last parts to come back from powder coating. If everything falls in line, may have her fired up next weekend!
Radiator repaired and re-installed.
Radiator repaired and re-installed.
Attachments
Water tubes cleaned up and hoses replaced.
Attachments
New stainless vent tube for the ZF installed.
Attachments
New clutch slave line against original line.
Attachments
New line installed. Slave going on next weekend after re-build.
Attachments
Cleaned up the starter and re-installed.
Attachments
Half shafts re-built and installed.
Attachments
Last one this weekend. Hope to finish up next weekend!
Attachments
Powder coating is finished!
Overflow Tank.
Overflow Tank.
Attachments
Swirl Tank.
Attachments
Exhaust done with High Temp coating.