Skip to main content

IMG_3752IMG_3753IMG_3755

Making a little more progress…

1) Bushings pushed out of the pedal assembly…  all parts ready for machining.

2) I’m going with a “straight” return spring to my clutch (instead of spending $35 on one that will break in 25K miles), so I drilled a hole in the clutch pedal.

3) Replaced the front length of vacuum line to the brake booster.  Line is 12mm ID, you need about 1 1/2’ of it. It is available at any VW supply store!

I guess the old “Aeroquip” line was from a PO upgrade, I’d be surprised if they used that kind of tubing originally in Italy!

It was hard as a rock, and crumbly at the ends!

Rocky

Attachments

Images (3)
  • IMG_3752
  • IMG_3753
  • IMG_3755

I am also replacing my passenger door handle tub with one from PI Motorsports.  I took Tsolo's advice in his thread here, and fabricated a "spring pressure diffuser" for the Hall Pantera door handle spring.  It came out good.

Hall door handle springs? | The De Tomaso Forums (infopop.cc)

Now all I have to do is find the three screws that hold the lock barrel in place, that I lost in my garage somewhere!



IMG_3815IMG_3814

Attachments

Images (2)
  • IMG_3815
  • IMG_3814
Last edited by rocky

Got these surplus M6 x1.0 nut plates installed…. Very cool.  These are to securely (re)attach the door handle.  One was stripped out…

The plastic inserts in the door were hard as rocks…

NOTE:  You only need two (per door), the fixture on the top forward part of the armrest is rigidly attached to the door metal.  BUT…  the long M6 - 1.0 machine screws fit the stock attachment as well!


IMG_3869
IMG_3870

Attachments

Images (2)
  • IMG_3869
  • IMG_3870
Last edited by rocky

Got more machining done on my pedal assembly.  Did the clutch pedal cross shaft for the 12mm needle bearing, and drilled out the main holes for the 26mm cross shaft bearings to 1”.

Fixturing and alignment were the main challenge.

The cross shaft was easiest, we had a collet clamp of the correct size we mounted to the mill table.

IMG_4116

The setup of the pedal bracket assembly and truing it up was the hard part.  We could only drill two of the four holes at a time (due to the length of our tooling), and then had to flip the piece over.

We did find that the machined surfaces on the “ears” were all true to each other, and so setup for drilling the second pair of holes was eased by using a 1-2-3 block at the bottom of the part for alignment on the machined surface.

I don’t have any pictures of our setup for the second pair of holes, but I assure you, the second half of the operation took about 1/4 the time as the setup for the first pair!

IMG_4119

We have a 26mm reamer that is long enough to “align bore” all four holes with one setup, but unfortunately our tool holder is way too long to fit in the manual mill…. So we’re working on getting the appropriate holder for the final operation.  We’ll do it in the CNC machine.

But good progress was accomplished today!

Rocky

Attachments

Images (2)
  • IMG_4116
  • IMG_4119
Last edited by rocky

Following onto related thread, I temporally installed my pedal assembly on tomorrow Kirk Evans spacer.

I am going to finish up the machining tomorrow on the pedal assembly, and will begin the reinstall soon.

I did take Steve’s advice and moved the vacuum hose forward.  Considering doing the same to the clutch hardline.

Kirk Evans sent me a threaded throttle cable extender…. Need to test fit that as well.

Rocky



IMG_4383

Attachments

Images (1)
  • IMG_4383

Add Reply

Post
×
×
×
×
Link copied to your clipboard.
×