He also found some Racing fluid for the brakes and clutch. (Not sure where?)
Made some progress on parts at home for re-finishing.
One muffler stripped...one to go.
One muffler stripped...one to go.
Attachments
Spreader bar before.....
Attachments
Spreader bar after rough stripping...more to follow with this piece...
Attachments
Got the tires from Larry mounted today and test fit them.
What do you think for a "Narrow Yellow" car?
What do you think for a "Narrow Yellow" car?
Attachments
Side View.
Attachments
rear View
Attachments
Fronts VS. rear.
Attachments
What Size are the rears I have 295 50 15 Toyo's I did not have to roll the fenders but I did anyway before I painted the car. Nice keep the pictures coming.
I believe they're 305/50/15s. and are still available.
Thanks for the comment on the picture.
More to come soon. Got to get her back together soon!
George
Thanks for the comment on the picture.
More to come soon. Got to get her back together soon!
George
Latest update! We've been busy, because we're so close to "Driving Time" we're finding more stuff to do. Go figure.
Larry set in a pair of his valve covers to cover the heads while cleaning things up a bit. I think he did a great job. I did the black paint last wekend, but the battery in my camera died. More pics to follow.
Larry set in a pair of his valve covers to cover the heads while cleaning things up a bit. I think he did a great job. I did the black paint last wekend, but the battery in my camera died. More pics to follow.
Attachments
Larry re-engineered all the ignition wiring and added relays. Shoulf make the starts on "Cool' NH mornings alot better! Plus easier to troubleshoot problems if I have any.
Attachments
New shocks are mounted.
Rear.
Rear.
Attachments
Front.
Attachments
one of the "New" issues we found was the radiator was leaking. Took it out and trying to find a local shop to fix it for a reasonable price. Last quote was 750!!!!! If anyone has a spare kicking around, let me know.
Attachments
A little overspray here and some clean up to do, but that's done now and will be on the next post.
Attachments
At least Larry finished up the wiring and the dash is put back together! Except for my Kenwood CD player that I have at home to replace the ribbon cable for the faceplate.
Attachments
More to come soon! Got the half shafts, exhaust, carb, valve covers and spreader bar to finish re-finishing.
George
George
Busy day yesterday wrapping up some small details. We're getting close to the finish, which is good because the weather is getting nicer.
My wife is almost done adding some color to the carb and valve covers.
My wife is almost done adding some color to the carb and valve covers.
Attachments
While I've been busy sorting out a messed up Kenwood CD player.
Attachments
Finished the half shafts, spreader bar and A/C fan shroud.
Attachments
This works was completed last week, before the battery in my camera died.
Attachments
Another from last week.
Attachments
Radiator area cleaned up.
Attachments
Repaired radiator. Thanks to Larry, found a place local that did all the work for less than $225.00
Attachments
Most of this weekend was the detail work around the ZF and engine.
Attachments
A/C shroud.
Attachments
ZF and shift linkage.
Attachments
Spark plug wire loom kit to be installed after my valve covers are done.
Thankfully there is only a few things left to do on the "Have to Do" list. Then I'll be out running and helping Larry on his next project.
Thankfully there is only a few things left to do on the "Have to Do" list. Then I'll be out running and helping Larry on his next project.
Attachments
Got a few more items off the list this weekend. Still waiting for the last parts to come back from powder coating. If everything falls in line, may have her fired up next weekend!
Radiator repaired and re-installed.
Radiator repaired and re-installed.
Attachments
Water tubes cleaned up and hoses replaced.
Attachments
New stainless vent tube for the ZF installed.
Attachments
New clutch slave line against original line.
Attachments
New line installed. Slave going on next weekend after re-build.
Attachments
Cleaned up the starter and re-installed.
Attachments
Half shafts re-built and installed.
Attachments
Last one this weekend. Hope to finish up next weekend!
Attachments
Powder coating is finished!
Overflow Tank.
Overflow Tank.
Attachments
Swirl Tank.
Attachments
Exhaust done with High Temp coating.